Any person wishing to encroach into the public right-of-way or public utility easement must first apply for and receive a Public Works Encroachment Permit. Questions regarding encroachment permits can be directed to the Public Works Department at (650) 802-4200 or pwpermits@cityofsancarlos.org

Examples include:

  • Sidewalk or driveway approach.
  • Sewer lateral.
  • Drainage.
  • Grading.
  • Debris box in street.
  • Parking restriction.
  • Traffic control.
  • Monitoring well or bore.
  • Public improvement.
  • Discharge.
Submitting Permit Applications

Submit encroachment permit applications by email to pwpermits@cityofsancarlos.org, or submit in person at the Public Works Counter in City Hall. To ensure efficient handling and response, all permit applications must be submitted with:

  1. Verification of Contractor's San Carlos Business License.
  2. Contractor's Certificate of Insurance, with City of San Carlos additionally insured.
  3. Valuation of work (contractor's bid, engineer's estimate, etc.).
  4. Detailed project plans.
  5. Traffic control plan, if needed.
Grading and hauling will not be allowed during the rainy season, from October through April, unless an exception is approved by the City Engineer.
Doc app

Document Center

The Document Center provides easy access to public documents. Click on one of the categories below to see related documents or use the search function.

Categories always sorted by seq (sub-categories sorted within each category)
Documents sorted by SEQ in Ascending Order within category

Important Permit Links11 documents

  • Encroachment Permit Application.
    document seq 0.00
  • Encroachment Permit Conditions of Approval.
    document seq 0.00
  • COVID-19 Encroachment Conditions.
    document seq 0.00
  • Insurance Requirements for Encroachment Permits.
    document seq 0.00
  • Credit Card Authorization Form.
    document seq 0.00
  • Sanitary Sewer Video Inspection Requirements.
    document seq 0.00
  • Standard Specifications and Details.
    document seq 0.00
  • Special Projects Worksheet.
    document seq 0.00
  • Small Project Reporting Sheet.
    document seq 0.00
  • Stormwater Review Process.
    document seq 0.00
  • C.3 and C.6 Reporting Sheet.
    document seq 0.00

Sign Up For E-NEWS

Join