| Fee Description | Fees | Technology Fees |
| Condominium Subdivisions: | | |
| Minor (up to 4 lots): | | |
| Tentative Map | $973 | $18 |
| Final Map | $973 plus actual surveyor charges with $500 deposit | $18 |
| Medium (5 to 10 lots): | | |
| Tentative Map | $2,596 | $49 |
| Final Map | $2,596 plus actual surveyor charges with $1,000 deposit for surveyor charges | $49 |
| Large (11 or more lots): | | |
| Tentative Map | $6,490 | $123 |
| Final Map | $6,490 plus actual surveyor charges with $1,500 deposit for surveyor charges | $123 |
| Final Map Revisions (per revision) | $973 plus actual surveyor charges | $18 |
| | | |
| Land Subdivisions: | | |
| Minor (up to 4 lots): | | |
| Tentative Map | $1,136 | $22 |
| Parcel Map | $2,271 plus actual surveyor charges with $1,000 deposit for surveyor charges | $43 |
| Medium/Large (5 or more lots): | | |
| Tentative Map | $163 per hour with $2,500 deposit | $22 |
| Final Map | $163 per hour plus actual surveyor charges with $5,000 deposit | $43 |
| Final Map Revisions (per revision) | $973 plus actual surveyor charges | $18 |
| | | |
| Improvements Within Right-of-Way: | | |
Plan Review & Checking (includes up to 3 reviews): | | |
| up to $1,000.00 | $405 | $7 |
| $1,000.01 to $5,000.00 | $649 + 8.11% of valuation > 1K | $12 |
| $5,000.01 to $10,000.00 | $973 + 6.50% of valuation > 5K | $18 |
| $10,000.01 to $20,000.00 | $1,298 + 6.49% of valuation > 10K | $25 |
| $20,000.01 to $50,000.00 | $1,947 + 6.50% of valuation > 20K | $37 |
| $50,000.01 to $100,000.00 | $163 per hour with $2,500 deposit | $37 |
| $100,000.01 and up | $163 per hour with $5,000 deposit | $37 |
| | | |
| Civil Onsite Stormwater Designs: | | |
Plan Review & Checking (includes up to 3 reviews): | | |
| up to $1,000.00 | $405 | $7 |
| $1,000.01 to $5,000.00 | $649 + 8.11% of valuation > $1k | $12 |
| $5,000.01 to $10,000.00 | $973 + 6.50% of valuation > $5k | $18 |
| $10,000.01 to $20,000.00 | $1,296 + 6.49% of valuation > $10k | $25 |
| $20,000.01 to $50,000.00 | $1,947 + 6.50% of valuation > 10k | $37 |
| $50,000.01 to $100,000.00 | $163 per hour w/ $2,500 deposit | $37 |
| $100,000.01 and up | $163 per hour w/ $5,000 deposit | $37 |
| - | | |
| Utility Companies Plan Check: | | |
| Point Repair/ Installation | $163 | $3 |
| Linear Replacement | $973 | $18 |
| New Linear Installation | $163 per hour with $2,500 deposit | $18 |
| | | |
Construction Inspection (Including Utilities): | | |
| up to $1,000.00 (up to 2 inspections) | $163 | $3 |
| $1,000.01 to $5,000.00 (up to 2 inspections) | $324 + 10.13% of valuation > 1K | $6 |
| $5,000.01 to $10,000.00 (up to 3 inspections) | $730 + 11.36% of valuation > 5K | $13 |
| $10,000.01 to $20,000.00 (up to 4 inspections) | $2,348 + 11.36% of valuation > 10K | $24 |
| $20,000.01 to $50,000.00 (up to 6 inspections) | $3,438 + 11.36% of valuation > 20K | $45 |
| $50,000.01 to $100,000.00 | $163 per hour with $2,500 deposit | $46 |
| $100,000.01 and up | $163 per hour with $2,500 deposit | $46 |
Post Construction Stormwater Device Inspection | $408 per device per year | |
| - | | |
| Grading: | | |
| Plan Review (includes up to 3 reviews): | | |
| Minimum Fee | $270 | $5 |
Per Cubic Yard Greater than 200 Cubic Yards | $1.35 per cubic yard | |
| Inspection: | | |
| Minimum Fee | $571 | $10 |
Per Cubic Yard Greater Than 200 Cubic Yards | $2.70 per cubic yard | |
Exception to the Winter Moratorium on Grading (per week) | $41 | |
| | | |
| Maps: | | |
AutoCAD Map: Digital Copy (format to disc): | | |
| First Disc | $204 | |
| Each Additional Disc of Same Map | $16 | |
AutoCAD Map: Photocopy of Existing (color, up to 8.5"x11"): | | |
| First Copy | $41 | |
| Each Additional Copy of Same Map | $16 | |
GIS Map: Print/Photocopy (color, up to 8.5"x11") (per print) | $16 | |
| | | |
| Miscellaneous: | | |
| Dirt Hauling | $10 per cubic yard | |
| Stand-Alone Sanitary Sewer Inspection | $211 | |
| Video Review of Existing Sewer Lateral | $81 | |
| Abandonment of R/W or Easement | $811 plus actual surveyor charges with $500 deposit | |
| Copy of Standard Specifications | Free via website, or see Admin Fees Photocopy/ Printing Charge | |
| Copy of Standard Details | Free via website, or see Admin Fees Photocopy/ Printing Charge | |
| Planning & Building Division Plan Check: | | |
| Planning Referral | $487 | |
| Building Division Plan Check of Onsite Civil Improvements (Without Grading) | $163 | |
| Document Request (Subject to Deposit) | $163 per hour with $500 deposit | |
| Debris Box/ Storage Container Permit | $81 | |
| Outside Sewer Agreement Fee | $163 per hour with $5,000 deposit | |
Community Banner, Hang & Remove (For-Profit Organizations) - not accepting application at this time | $292 | |
Community Banner, Hang & Remove (Non-Profit Organizations) | $0 | |
| Driveway Approach Inspection | $243 | |
| Wide Load Processing (1) | $16 | |
| Sidewalk Dining Approval | $243 | |
| Temporary NO Parking Signs | $1 per sign | |
Curb Painting for Five-Year Parking Restriction (per space) | $527 | |
| Semi-Annual Permit Parking in City Lots | $25 for six-month permit | |